Home > News Center > Company news > Repair and maintenance of high-speed centrifugal atomizer

Repair and maintenance of high-speed centrifugal atomizer


high speedcentrifugal atomizerTo operate smoothly at high speed, therefore, during the installation process, the flange surface of the atomizer at the upper end of the tower body should reach a basic level, and a rubber flange pad must be added between the two planes to prevent vibration.centrifugal atomizerMaintenance needs to pay attention to:

1.The nozzle should use 30 (N46) or (N46) high-speed mechanical oil lubricant.

2.examinecentrifugal atomizerCheck whether the lubricating oil is at the normal position of the oil dipstick line (note: the amount of oil injected must not exceed the oil level line, otherwise the oil will penetrate into the lower part of the spindle and reach the atomization plate, causing oil leakage). After starting the machine, pay attention to whether the oil supply from the oil pump is normal. If you find that the oil pump is not supplying oil, you should stop immediately and disassemble or replace the oil pump. It can only be used after the oil supply is normal.

3.If abnormal sound or severe vibration occurs during use, stop immediately and check the cause until normal use.

02

4.In order to extend the service life, it is recommended to use twocentrifugal atomizerUse in rotation. Usually, after the atomizer frontier needs to work for a period of time, it is necessary to remove the material liquid distribution plate, atomization plate, guide shaft and other parts for cleaning. The guide bearing is slightly scratched and can be polished with fine emery cloth. If there are serious scratches, they should be replaced with new ones. Frontier usage time (first shift is 96 hours, second shift is 48 hours, third shift is 24 hours). The use time can be appropriately extended when the water distribution tank is cooling.

5.When disassembling and assembling the atomizer disk and other parts, special care should be taken not to bend the main shaft, and the nuts fixing the atomizer disk must be tightened to prevent loosening and falling off.

6.New oil needs to be replaced once a month. When replacing, remove the atomizer plate and casing, unscrew the oil drain screw on the upper end of the machine, drain the oil, wrap the oil drain screw with raw material tape and re-screw it, and add about one kilogram of new oil, but be careful not to exceed or fall below the oil level line.

Wuxi Wode Rotary Atomizer Technology Co., Ltd. is a high-tech enterprise with more than 20 years of R&D and manufacturing of rotary atomizers. The company is located in the Qianzhou Town Industrial Zone of Wuxi City, a famous economic and cultural city. The company has convenient transportation and is close to the Shanghai-Nanjing Expressway. The company has a registered capital of 8 million yuan and annual sales of more than 30 million yuan. Products coveratomizerThe complete machine, the main shaft of the atomizer disk, the box body, the gear, the lower disassembly and other accessories.


Copyright: World Atomization_Atomizer_Atomizing disc  Business license 苏ICP备16043265号-1
#
在线客服

x
  • 在线客服 18:48

    您好,很高兴为您服务!
  • 在线客服 18:48

    您好,可以留下您的手机电话吗?